Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 83639 REL 60: 1991-028-00 EXP PIT TAGGING WILD CHINOOK
Project Number:
Title:
Pit Tagging Wild Chinook
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
83639 REL 60
Contract Title:
1991-028-00 EXP PIT TAGGING WILD CHINOOK
Contract Continuation:
Previous: Next:
83639 REL 47: 1991-028-00 EXP NOAA PIT TAGGING WILD CHINOOK
  • CR-375195: 1991-028-00 EXP PIT TAGGING WILD CHINOOK
Contract Status:
Issued
Contract Description:
Assess the migrational characteristics and estimate parr-to-smolt survival for Snake River wild spring/summer Chinook salmon smolts at Lower Granite Dam.  Characterize parr and smolt survival and movement out of natal rearing areas of selected streams and examine the relationships between fish movement, environmental conditions within the streams, and weather and climate data.  Collect parr-to-smolt growth information on previously PIT-tagged wild Chinook salmon parr at Lower Granite Dam each spring.

Complex interrelationships between climate conditions and stream flow play an important role in yearly migration timing. Other abiotic factors that influence migration include water temperature, turbidity, and photoperiod. Biotic factors also contribute to the migration timing and survival of wild salmon and include physiological development, variability in stock behavior, and fish size. These complexities continue to drive a high and continual need for monitoring of threatened stocks. This study continues to supply managers with in-season information for management decisions related to flow augmentations, dam operations including spill, and transportation. Environmental monitoring in streams and climate/weather monitoring is continuing and relationships to parr and smolt movements will continue to be evaluated.
Account Type(s):
Expense
Contract Start Date:
04/01/2024
Contract End Date:
03/31/2025
Current Contract Value:
$506,359
Expenditures:
$314,374

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Order
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Clearance Complete A: 165. Submit all required Permits to BPA for Project 199102800 03/31/2025
Collect and PIT tag wild Chinook salmon parr, annually, in Salmon River Basin B: 158. Collect and PIT tag wild Snake River spring/summer Chinook salmon parr 09/30/2024 07/31/2024
Produce accessible, error-checked datasets C: 157. Collect PIT tag monitoring, water quality, and growth data - Tributaries 03/31/2025 08/22/2024
Produce accessible, error-checked datasets D: 157. Collect PIT tag monitoring and growth data - Mainstem 03/31/2025 07/01/2024
Deliverable: An accessible, error-checked data set with metadata E: 162. Analyze, Interpret, and compile all tagging, monitoring, and growth data - Tributaries 03/31/2025
Deliverable: An accessible, error-checked data set with metadata F: 162. Analyze, interpret, and compile all tagging, monitoring, and growth data - Mainstem 03/31/2025
Effective implementation management and timely contract administration G: 119. Project management, scheduling and agency coordinations 03/31/2025
Completed Annual Report I: 132. Submit Progress Report for the period 1/1/2024 to 12/31/2024 03/31/2025

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Submit all required Permits to BPA for Project 199102800
B 158 Collect and PIT tag wild Snake River spring/summer Chinook salmon parr 04/01/2024
C 157 Collect PIT tag monitoring, water quality, and growth data - Tributaries 04/01/2024
D 157 Collect PIT tag monitoring and growth data - Mainstem 04/01/2024
E 162 Analyze, Interpret, and compile all tagging, monitoring, and growth data - Tributaries
F 162 Analyze, interpret, and compile all tagging, monitoring, and growth data - Mainstem
G 119 Project management, scheduling and agency coordinations
H 132 Submit Progress Report for the period 1/1/2023 to 12/31/2023
I 132 Submit Progress Report for the period 1/1/2024 to 12/31/2024
J 185 Periodic Status Reports for BPA